GE Tynagh Power Station

Operator: General Electric
Client: Tynagh Energy Limited

Allegro Acoustics was commissioned by TEL to complete noise control engineering design for specific plant elements related to the environmental aspect of occasional start up and shut down of the station. We initially completed in depth acoustic measurements on the power station site to evaluate and quantify sound power levels for all major noise sources on the power station site and followed this with the development of an in depth acoustic model for the power station and surrounding area. Noise Control Engineering design was completed and tested within the model prior to implementation.